100.1 GO FM - We're Your Feel Good Pop Station

Hay River highrise on fire

Mackenzie Place in Hay River, the tallest structure in the NWT, is on fire.

From photo and video uploaded to Facebook, it appears an apartment on the 10th or 11th floor is engulfed in flames.

Residents evacuated from the building are being directed to the community hall, at the Hay River recreation centre.

Glenn Smith with the Town of Hay River says staff are registering evacuees and identifying what needs they have. They are also registering pets who may still be left in the building.

Emergency pens are being set up at the Hay River Animal Shelter for displaced pets.

A Facebook photo appears to show an apartment on the 10th or 11th floor of the Hay River highrise on fire. Danielle Antoine photo

The fire department is also fighting a fire at the Hay River landfill which has been burning since March 3rd. Yellowknife and Fort Smith fire crews are assisting with this fire.

Yellowknife fire chief John Fredericks says four local firefighters were sent to Hay River, originally to work on the dump fire. He says they could be working on the highrise, however he hasn’t heard back about this yet.

More to follow.

Emelie Peacock
Emelie Peacock
News Reporter

Continue Reading

You may also like



cjcd Now playing play

- Advertisement -

Related Articles

- Advertisement -

Latest News

Will LWBs guidelines bring awareness about water laws and compensation?

Gwich’in, Mackenzie Valley, Sahtu, and Wek’èezhìı Land and Water Boards – collectively, the LWBs have released a set of guidelines to raise awareness about the existence of water laws and the claims compensation process in the N.W.T. Despite the N.W.T. 's long history of mining, there have been few applications and leadersa at the organization say a lack of awareness of the laws and lack of accessibility to the legal language of the water acts is part of the reason why.

Mackenzie Valley Hwy updates coming soon

“The sessions will provide an update on the Mackenzie Valley Highway Project, including an update on the environmental assessment process and timelines for regulatory milestones. Updates will also include planned engagement on multiple topics beginning in 2026 and ongoing through construction of the Project. Topics will include development of the Community Readiness Strategy, Corridor Working Group and Sub-Working Groups, and management plans for the Project,” said Lapointe.

NorthWords NWT opens submissions for 2026 Book Awards

NorthWords NWT has opened submissions for their 2026 Book Awards. The awards are a celebration of outstanding book authors with strong connections to the NWT. 

Taltson hydro site to return to service by end of March

The Northwest Territories Power Corporation says remediation work on the surge tank at the Taltson Hydro site is advancing but may take longer than planned.

Minister Wawzonek says “good news coming from North” post Trump talk

“I think all Canadians are probably concerned about it to a degree,” says Northwest Territories Infrastructure Minister and Deputy Premier Caroline Wawzonek, who adds that while any formal response to recent threats from the U.S. to annex Canada will come from the feds, it's an important time for everyone across the North to “assert sovereignty.” By “positioning the North to be economically strong” this will also benefit the rest of the country, said Minister Wawzonek.